Please clean up the surrounding environment before using this machine. There must be no dangerous goods and other sundries.

Do not install or modify parts that are not suitable for the performance of the machine, otherwise accidents may occur.

The overalls of the operators should be as light and thin as possible. Special attention: The sleeves of work clothes must be fastened and cannot be opened.
 
After the adjustment of each part is completed, turn on the main key switch and slowly turn the machine to check whether the equipment is working normally and whether there are vibrations or abnormal phenomena.
 
The main drive system of the machine is located at the bottom of the machine and is closed by a stainless steel door with a lock. When adjusting the load, it must be opened and adjusted by a dedicated person (operator or maintenance technician). Before starting the machine again, you must confirm that all doors are in good condition.

The machine is closed by a transparent plexiglass door above the desktop. When the machine starts normally, no one can open it without authorization.

In case of emergency, please press the red emergency stop button to eliminate the fault in time. If you need to restart, you must confirm that the fault has been completely eliminated. Reset the emergency stop button and restart the host.


The machine should be operated according to regulations by trained and qualified personnel. Other people are not allowed to operate the machine at will, otherwise it will cause personal injury and machine damage.